TutorialLearn by doing

Follow your first project through its workflow

In this tutorial, we’re going to open a project in Collaboration Hub, read its brief, add to it, and move it to the next stage of its workflow. Projects pass between several people on their way from brief to publication. Each person needs to find the work, understand it, and pass it to the next person. By the end, you’ll have taken a project through one stage of its workflow and know where to check its progress afterwards.

Prerequisites

To follow this tutorial, you need:

  • Access to Collaboration Hub, and a project that is currently with you for action. Use a practice project rather than live work, because the last step moves the project to its next stage and notifies the next person in the workflow. The project you created in Brief your first project is ideal.

  • Access to work on Collaboration Hub projects. This doesn’t come from a user role: your administrator grants it through a group, and group names vary between workspaces.

What you see here depends on your workspace’s configuration. Project types, workflow stages, the tabs in a project, and the roles assigned along the way are set up for your workspace, so the names you see may differ from the ones here. To change them, contact your administrator.

What we’ll create

We’ll find a project from the dashboard and the project list, read its brief and export it, and leave a comment for the team. Then we’ll check its milestones and move it to the next stage using its transitions.

Throughout the tutorial, we’ll call the project Tutorial spring campaign. Use the name of your own practice project wherever you see it.

The tutorial takes about 30 minutes, including the videos, in seven steps:

Step 1: Open your dashboard

The dashboard is where Collaboration Hub tells you what needs your attention.

Your project dashboard (1 min 19 s)

We’re going to open the dashboard and find our project there.

  1. From the main menu, select Collaborate.

  2. Find the My Projects and Actions area.

You’ll notice that:

  • My Projects and Actions lists the projects that are with you to action, and the active projects you’re involved in.

  • Below it, a row of widgets represents stages of the workflow, such as draft projects or content in review.

  • Each widget displays a count in its top-right corner: the number of projects currently at that stage.

Projects you’ve started but not yet submitted also appear here.

Return to an unfinished project (47 s)

If you created Tutorial spring campaign yourself and haven’t submitted it, it’s listed in the Draft Briefs widget, in the briefing state.

Step 2: Find the project in the project list

The dashboard displays what needs you now. The project list displays every project you can reach, with tools for finding one.

Search and filter projects (2 min 21 s)

We’re going to find our project by name, then narrow the list with a filter.

  1. On any dashboard widget, select View to open the project list.

  2. Select the search bar and start typing Tutorial spring campaign.

  3. Choose to search by project name, then submit the search.

    Your search term is added as a filter above the list.

  4. Select the filter icon, and in the State filter, choose the stage your project is at.

You’ll notice that:

  • Each row displays the project’s ID, name, type, owner, start and end dates, current workflow state, next milestone, and who is responsible for the next stage.

  • The project ID is generated automatically when a project is created. You can search by ID instead of name, which is the quickest way to find a project someone has quoted to you.

To clear the filters, select the cross on each one, or open the filter panel and select Clear all. Select the project’s name to open it.

Step 3: Read the brief

Everything you need to understand a project sits in its tabs.

Review a project’s information (3 min 30 s)

We’re going to read the brief, then export it so we could share it outside Storyteq CMP.

  1. Select the briefing fields tab on the left.

    Use the toggle to display the information the project owner provided.

  2. Select the Resources tab and open the supporting documents.

    Documents can’t be previewed in the platform, so download them to read them.

  3. Select Show project details at the top of the project, then select the option to export fields.

  4. Select Export all project fields.

    This includes the fields completed at earlier stages as well as the current ones.

  5. Select Generate files, then download the file.

You’ll notice that the exported document includes the brief’s current status, the project creator, the project dates, and every briefing field completed so far.

Some projects contain sub-projects, each with its own workflow, where content for approval is uploaded.

Move between a project and its sub-projects (50 s)

If Tutorial spring campaign has sub-projects, use the arrow button at the top of the project to switch between the top-level project and each sub-project. The tabs display the information for whichever one you select.

Step 4: Leave a comment

Comments keep the conversation about a project with the project, rather than in email.

Add and reply to comments (1 min 11 s)

We’re going to add a comment, then reply to it.

  1. Select the Comments tab.

  2. Enter Brief read and exported for the team. and select Submit.

  3. On your comment, select the reply arrow.

  4. Enter Exported file shared with the studio. and select Submit.

You’ll notice that:

  • Each comment is recorded with a number, your username, and the date and time.

  • Your reply carries the number of the comment it answers, which keeps the thread together.

Everyone with access to the project can read its comments, at any stage. That’s what makes the comments a record of the decisions made along the way.

Step 5: Assign the next person

At some stages, the workflow needs you to choose who does the next piece of work, such as a content creator.

Assign the next person (1 min 19 s)

We’re going to make that assignment, if our project’s current stage asks for one.

  1. Check the project for an assignment option, such as Assign project manager or Assign content creator.

    If there isn’t one, the current stage doesn’t need an assignment, and you can continue to step 6.

  2. Select the assignment field and start typing a colleague’s name.

    Only users set up for that role appear in the list.

  3. Select the colleague, then select Confirm Changes.

You’ll notice that the assignment is part of the workflow, not the Collaborators tab. The person you assign is notified when the project reaches them.

Step 6: Check the milestones

Milestones are the checkpoints a project should reach by set dates.

Manage milestones (1 min 34 s)

We’re going to check our project’s milestones, then see them on the timeline alongside other projects.

  1. Select the Milestones tab.

    The dates displayed were calculated when the project was created.

  2. Review the dates, but don’t change them for this tutorial.

You can change a milestone date by selecting the calendar icon next to it, when the project is with you and you have editor rights. To recalculate every date at once, select Actions, then Calculate Milestones.

The milestone timeline (2 min 16 s)
  1. Return to the project list and select Timeline.

  2. Find Tutorial spring campaign on the left.

You’ll notice that the markers along the project’s bar indicate each milestone’s status:

  • A tick marks a completed milestone.

  • Red marks a milestone that is overdue, or wasn’t achieved on time.

  • White marks a planned milestone.

Select the project’s bar to display its details, then select View project to return to it.

Step 7: Move the project to the next stage

When you’ve finished your part of a project, a transition hands it to the next stage.

Move a project to its next stage (22 s)

We’re going to use the transitions panel to move our project to the next stage.

  1. In the top-right corner of the project, find the transitions panel.

  2. Select the transitions field to display your options.

  3. Choose the transition for the next stage.

  4. Select Go.

The transition grants access to the next person, sends notifications, and applies any other automated workflow actions. If you don’t select Go, none of that happens, and the project stays with you.

When no transitions are available (30 s)

You’ll notice that the transitions panel now tells you no further action is required from you. That means the project is no longer with you to action, not that something has gone wrong.

Open the project list again. Tutorial spring campaign displays its new workflow state, and the person responsible for the next stage.

The finished stage

Here’s what we’ve done:

  • Project: Tutorial spring campaign, found from the dashboard and the project list.

  • Brief: read, with its fields exported to a file.

  • Comments: one comment and one reply, recorded with numbers and timestamps.

  • Milestones: checked on the project and on the timeline.

  • Stage: moved to the next stage with a transition, so the project is now with the next person.

Conclusion

In this tutorial, you’ve learned how to:

  • Find a project from the dashboard and the project list.

  • Read and export a project’s brief, and move between a project and its sub-projects.

  • Add and reply to comments.

  • Make a workflow role assignment.

  • Check milestones on a project and on the timeline.

  • Move a project to its next stage with a transition.

When the project reaches review, continue with Run your first project review. Understanding Collaboration Hub explains how projects and the workflow fit together.